Providence Presbyterian Church at 3510 Austin Parkway in Sugar Land, Texas expanded its campus with a new concrete parking lot. Keeton Construction Services' scope covered site grading, concrete paving with curb and gutter, landscape islands, an entry drive and sidewalk connections to the existing building, storm drainage inlets, site lighting, and parking striping including ADA accessible stalls.
Project Details
- Location
- Sugar Land, TX
- Sector
- Commercial, Concrete Construction
- Client
- Providence Presbyterian Church
- Completed
- 2026
- General Contractor
- Keeton Construction Services
- Services
- Site Development & Excavation · Concrete Foundations & Paving
Project Overview
Providence Presbyterian Church sits at 3510 Austin Parkway in Sugar Land, Texas, on a campus bordered by an established residential neighborhood. The expansion added a new concrete parking field on the open ground beside the existing building, tied into the campus drives and the public street.
Scope of Work
Keeton Construction Services’ scope for this project included:
- Site grading and preparation of the new parking area
- Concrete paving for the parking field, with sawcut control joints and curb and gutter around the perimeter
- Curbed landscape islands within the lot
- Concrete entry drive connecting the new lot to the existing building and the adjacent street
- Concrete sidewalk and pedestrian connections from the lot to the building entry
- Storm drainage inlets set into the pavement
- Site lighting
- Pavement striping: standard stalls, directional arrows, ADA accessible stalls with a striped access aisle and pedestrian crossing, and painted perimeter curbs
Building on an Active Church Campus
Church parking is a Sunday-morning problem before it is a construction problem. The work sits directly against the existing building and the drive the congregation already uses, and the site backs onto residential lots on two sides. Sequencing the paving so the church kept usable access, and keeping the earthwork and concrete operations contained, matters as much on a job like this as the pour itself.
Why Concrete
Concrete paving costs more up front than asphalt and takes longer to place. On a church lot it usually earns that back. The surface holds up to the heavy weekend loading, the summer heat, and the Gulf Coast soil movement that shortens asphalt life in this part of Texas, and it needs far less maintenance over the life of the lot, which matters for an owner running on a donation budget.
Frequently Asked Questions
Where is the Providence Presbyterian Church expansion located?
The project is at Providence Presbyterian Church, 3510 Austin Parkway, Sugar Land, Texas 77479, in Fort Bend County southwest of Houston.
What was Keeton Construction Services' scope on this project?
Keeton Construction Services built the new concrete parking lot and the site work around it: grading, concrete paving with curb and gutter, landscape islands, an entry drive and sidewalk connections to the existing building, storm drainage inlets, site lighting, and pavement striping.
Is the new parking lot concrete or asphalt?
Concrete. The lot is poured concrete paving with sawcut control joints and cast curb and gutter, which holds up better than asphalt under Gulf Coast heat and soil movement and needs less maintenance over its life.
Does the new lot include ADA accessible parking?
Yes. The lot includes marked ADA accessible stalls with a striped access aisle and a striped pedestrian route to the building entry.
Does Keeton Construction Services build church and worship facility projects?
Yes. Keeton Construction Services works with churches and non-profit facilities across the Houston area on parking and site expansions, building additions, and renovations.